Longview Drive, Balsam Lane, and Riverside Drive Neighborhoods
August 14, 2006 - IMPORTANT
NOTICE
Dear Riverside Drive, Vernon Circle, and Adams Drive Neighborhood
Residents:
On Tuesday,
August 15, 2006, weather permitting; the Township's contractor,
Top Line Construction will be installing the new surface course
of pavement on the remaining section of Riverside Drive between
Woodside Drive and Princeton-Kingston Road. The paving operation
will start at Woodside Drive and work toward Prospect Avenue and
will then proceed from Princeton - Kingston Road back to Prospect
Avenue completing the paving. Should the paving not be completed
on Tuesday, the work will resume the next working day, weather
permitting.
During
this time, and until the surface course road paving is complete,
residents should remove their vehicles from their driveways and
from the Riverside Drive, Vernon Circle, and Adams Drive roadways
prior to 7 AM, as access will be restricted during work hours,
but will be restored upon the completion of paving at the end
of the day. Residents are asked to park on Woodside Drive or on
Prospect Avenue west of Riverside Drive. Please allow for delays
when leaving or returning to your home.
After
the paving of the surface course on the roadway, residents will
be prohibited from using the road for a 2-hour period up until
approximately 8 P.M. This restriction will prevent permanent marring
of the blacktop during its "curing period". Residents
will then be allowed to return to their driveways once the road
is opened.
Work hours
will generally be 7:00 AM to 6:00 PM. Provisions will be made
for continued services such as mail delivery, garbage and recycling
pick-up.
If the
Engineering Department can be of assistance or if you have any
questions prior to 9:00 AM or after 5:00 P.M., please contact
Scott Hutchinson, Engineering Inspector (cell phone #731-2631).
Between 9:00 AM and 5:00 PM on weekdays, you may contact Mr. Hutchinson,
or myself at 921-7077.
Your assistance
in continuing to tolerate the temporary inconvenience associated
with this work, which will lead to a permanent improvement of
your neighborhood is appreciated.
Sincerely,
Robert
V. Kiser, P.E.
Township Engineer
August
2, 2006 - IMPORTANT
NOTICE
Dear Riverside Drive Neighborhood Residents:
On Thursday,
August 3, 2006, weather permitting; the Township's contractor,
Top Line Construction will be installing the new base course of
pavement on Riverside Drive between Woodside Drive and Prospect
Avenue. Driveway aprons along this section of Riverside Drive
will be paved on Friday, August 4, 2006. Should the paving not
be completed as scheduled, the work will resume the next working
day, weather permitting. The new surface course of pavement on
this section is tentatively scheduled to be installed on Monday,
August 7, 2006, weather permitting. A second notice will be hand
delivered to all residents prior to the final surface paving.
During
this time, and until the base course paving is complete, residents
should remove their vehicles from their driveway prior to 7 AM,
as access will be restricted during work hours, but will be restored
upon the completion of paving at the end of the day. Parking is
available on adjacent roads where work is not taking place. Residents
on Riverside Drive are asked to park on Woodside Drive, Adams
Drive, and Prospect Avenue. Please allow for delays when leaving
or returning to your home.
After
the paving of the base course on the roadway, residents will be
prohibited from using the road for a 2-hour period up until approximately
7 P.M. This restriction will prevent permanent marring of the
blacktop during its "curing period". Residents will
then be allowed to return to their driveways once the road is
opened.
Work hours
will generally be 7:00 AM to 5:00 PM. Provisions will be made
for continued services such as mail delivery, garbage and recycling
pick-up.
If the
Engineering Department can be of assistance or if you have any
questions prior to 9:00 AM or after 5:00 P.M., please contact
Scott Hutchinson, Engineering Inspector (cell phone #731-2631).
Between 9:00 AM and 5:00 PM on weekdays, you may contact Mr. Hutchinson,
or myself at 921-7077.
Your assistance
in continuing to tolerate the temporary inconvenience associated
with this work, which will lead to a permanent improvement of
your neighborhood is appreciated.
Sincerely,
Robert
V. Kiser, P.E.
Township Engineer
Dear Longview
Drive, Balsam Lane, and Riverside Drive Neighborhood Residents:
On Friday, July 14, 2006, weather permitting; the Township’s contractor, Top Line Construction will be installing the new surface course of pavement on Longview Drive, Balsam Lane, and on Riverside Drive between Prospect Avenue and Longview Drive. Should the paving be completed on Friday, the work will resume the next working day beginning on Monday, July 17, 2006.
During this time, and until the surface course road paving is complete, residents should remove their vehicles from their driveway prior to 7 AM, as access will be restricted during work hours, but will be restored upon the completion of paving at the end of the day. Parking is available on adjacent roads where work is not taking place. Residents on Longview Drive are asked to park on Lake Drive, Dogwood Lane or Knoll Drive. Residents on Balsam Lane and Riverside Drive are asked to park on Prospect Avenue or Sycamore Road. Please allow for delays when leaving or returning to your home.
After the paving of the surface course on the roadway residents will be prohibited from using the road for a 2-hour period up until approximately 7 P.M. This restriction will prevent permanent marring of the blacktop during its “curing period”. Residents will then be allowed to return to their driveways once the road is opened.
Work hours will generally be 7:00 AM to 5:00 PM. Provisions will be made for continued services such as mail delivery, garbage and recycling pick-up.
If the Engineering Department can be of assistance or if you have any questions prior to 9:00 AM or after 5:00 P.M., please contact Scott Hutchinson, Engineering Inspector (cell phone #731-2631). Between 9:00 AM and 5:00 PM on weekdays, you may contact Mr. Hutchinson, or myself at 921-7077.
Your assistance in continuing to tolerate the temporary inconvenience associated with this work, which will lead to a permanent improvement of your neighborhood is appreciated.
Sincerely,
Robert V. Kiser, P.E.
Township Engineer
|