Davies Drive Pathway
June 8, 2007 Project Update
There has been a lot of activity on Davies Drive lately. Construction of a six foot wide pathway began on Wednesday and good progress has been made to date.

Along with the pathway, a dry laid field stone retaining wall is being installed to accommodate the pathway in the areas where existing ground was too steeply graded.

There have been some conflicts with underground utilities and steps are being taken to have these conflicts resolved as quickly as possible so that the entire pathway can be completed in a timely manner.
Residents and visitors to the Davies Drive neighborhoods are reminded to be cautious around the construction equipment and construction materials at all times whether you are walking, cycling or driving. If you have any questions or concerns, please feel free to contact me on my cell phone at 609-731-6615.
Anthony E. Soriano Jr., E.I.T.
Engineering Assistant
Princeton Township Engineering Dept.
609-921-7077 ext. 222
|